Candidate Profile

SUPERVISOR MECANICAL Shut Douwn , Commissioning Start Up Supervisor, Coordinator Construction, Site Manager Quality- Control. Supervisor Piping – Pipe – lines , Oil – Gas , Power – Plant , Refinery Wells Installations, Junctions – Manifolds , Supervising. All testing Operations Service: Flushing, Air-blowing, Pneumatic Testing, Hydrostatic Testing, Dewatering, leak testing Pigging (foam pig, brush pig, conical cup pigs, batching, gauging pigs) Cleaning, Nitrogen Purging, PPS Chemical cleaning, Oil flushing , lube oil flushing , Steam Blowing, Hydro- Milling. Flange Management ;SHUT DOWN ,Drying Hot Tapping Pipe line operations ,Project Petroleum Service hamichi.abdelmadjid@yahoo.fr abdelmadjidhamichi@rocketmail.com CONTACT: +213  662 76 61 64 / 0556 856 434

engineer piping pipelines oil gas.supervisor construction  algeria Member from 4 years

Mecanical engineer Piping /Pipe Lines with over 32years of progressive experience in project construction , field supervion and construction management in onshore oil and gas industry including Pipe Line and refinery , Pumping and Mettering stations.
Have a good experience in EPC Project : Excellent understanding of oil / Pipe Line
Previous experience in working overseas and the ability to adapt to a broad spectrum of cultural and organizational styles.
Broady experience in onshore facilities and construction
Knowledge inreviewing and implementing general arrangement drawings ,P I D and Mecanical Piping drawings and Pipe Line alignment drawings.

Headline : Responsible for planning and executing piping projects to ensure maximum productivity while keeping an optimum level of quality. Supervising and guiding on all incoming documents for piping, making as-built drawings and mark-ups on modified lines in the field, and conducting a daily toolbox talk to all workers before engaging work every morning.
SkillS : Leadership, Self-Motivated, Organized, Team Oriented, Computer, Problem Solving, Project Management.
Description :
Assisted with the completion of the units that were running behind on its completion date.
Coordinated work of subcontractors with scaffolding, painting, and insulation to complete work in the unit on schedule.
Attended daily meetings with the client to discuss the progress of all work being done and answered any and all questions they had concerning job completion.
Assigned all the work packages to the foremen and assigned all the work crews.
Managed the turn-over packages for commissioning within the discipline work planning.
Reported discrepancies occurring design errors and collisions for initiating the project-specific solution.
Planned and participated in acceptance testing . pressure testing of supplies and serviced from subcontractors.
Ability to respond promptly and professionally to requests and issues
Good written and verbal communication skills.
Considerable experience of supervising Construction staff to achieve effective construction execution.
 Leadership, Self-Motivated, Organized, Team Oriented, Computer, Problem Solving, Project Management.
NITROGEN PIPING, NITROGEN PURGING, NITROGEN DRYING .HYDROTESTING OF PIPELINES, and DEWATERING INERTING GAS. LEAK TESTING. Flood, clean, gauge, and strength test pipeline prior to installation. Dewater, dry/swab with inhibited MEG, and nitrogen purge each pipeline
Nitrogen pack tie back pipelines for nitrogen dewatering, drying, and purging activities
Leak test connections for each pipeline following platform and manifold tie-ins.
Flood, clean, and strength test each flow line.
Cap and displace water in dead legs with inhibited MEG into the main line.
Pipeline Commissioning Services;
Pipeline flooding testing and dewatering
Pipeline Commissioning
Pipeline construction always involves work to be executed under the most difficult
Circumstances. Pipelines cross: deserts, mountains, rivers, lakes and domestic areas.

Skills

Leadership Self-Motivated Organized Team Oriented Computer Problem Solving Project Management. Description : Assisted with the completion of the units that were running behind on its completion date. Coordinated work of subcontractors with scaffolding painting and insulation to complete work in the unit on schedule. Attended daily meetings with the client to discuss the progress of all work being done and answered any and all questions they had concerning job completion. Assigned all the work packages to the foremen and assigned all the work crews. Managed the turn-over packages for commissioning within the discipline work planning. Reported discrepancies occurring design errors and collisions for initiating the project-specific solution. Planned and participated in acceptance testing . pressure testing of supplies and serviced from subcontractors. Ability to respond promptly and professionally to requests and issues Good written and verbal communication skills. Considerable experience of supervising Construction staff to achieve effective construction execution.  Leadership Self-Motivated Organized Team Oriented Computer Problem Solving Project Management.

Education

  • ALGERIAN INSTITUT OF OIL AND GAS BOUMERDES ALGERIA
     engineer piping pipelines :  PIPING PIPELINES
     Grade / GPA : engineer piping pipelines oil gas
     Qualification : ENGINEER

Experience

URL(s)